Maintain Quotation – Maintain Quotation Details

Activity overview

Glossary

Basics of using Ramco Enterprise series web page

Using online help

This tab allows the supplier for the creation of a quotation for a selected RFQ. The supplier can create quotation for a RFQ until all quantity is being quoted and should be before the closing date of RFQ. The system displays the supplier details, company details, OU details and amount details. The supplier provides the Quotation details, Advance and Insurance  details and Shipping and Delivery details. The system displays the creation and modification details.

The “Maintain Quotation” page appears.

The system displays the “Maintain Quotation Details” tab by default on the launch of the page.

The system displays the following in the header:

Supplier Code

The code identifying the supplier.

Supplier Name

The name of the supplier.

The system displays the following details in the “Quotation Details” group box.

Company Code

The code identifying the company.

Company Name

The name of the company.

Organisation Unit Code

The code identifying the Organisation Unit.

Organisation Unit Name

The name of the Organisation Unit.

Quotation No.

Use the drop down list to select the number identifying the quotation.

 

Help facility available.

Quotation Date

The date on which the quotation was raised(Date Format).

Numbering Series

Use the drop down list to select the numbering type for generating the quotation number .

The system displays the following :

RFQ No.

The number identifying the RFQ .

RFQ Date

The date on which the RFQ was raised .

Contact Person

The name of the contact person of the supplier(Alphanumeric,45).

Payment Term

The terms and conditions pertaining to the payment to be made for the items specified in the quotation. (Alphanumeric,30).

Mode Of Payment

The mode in which the payment for the items will be made. (Alphanumeric,25).

Valid From

The date from which the quotation is valid(Date Format) Mandatory.

Valid To

The date up to which the quotation is valid (Date Format). Mandatory.

The valid to date should be later than the valid from date.

Currency

Use the drop down list to select the currency specified for the quotation. Mandatory.This is the currency in which the rates are specified.  

Advance Payable(%)

The percentage of advance payable by the customer to the supplier.This value should be positive.(Integer).

Insurance Term

The  terms and conditions pertaining to the insurance. (Alphanumeric,20). Mandatory.

Inco Term

The International Commercial terms of the supplier. (Alphanumeric,40). Mandatory.

Inco Place

The place at which the INCO term is applicable(FOB) (Alphanumeric,60). Mandatory.

Carrier

The  carrier in which the goods are going to be transported. (Alphanumeric,40). Mandatory.

Mode Of Transport

The  mode of transport for the transfer of goods from the supplier to the customer. (Alphanumeric,20).Mandatory.

Packaging Remarks

The additional information related to the packing done to the items. (Alphanumeric,150).Mandatory.

Shipping Remarks

The additional information related to the shipping done to the items. (Alphanumeric,200).Mandatory.

The system displays the following in the “Amount Details” group box :

Total Value

The total value of the items specified in the quotation.

Basic Value

The basic value of the items specified in the quotation.

Taxes

The taxes of the items specified in the quotation.

Additional Charges

The additional charges of the items specified in the quotation.

Exchange Rate

The Exchange Rate of the currency.(Integer). This value should be greater than zero.

The system displays the following in the multiline :

Quotation Line No.

The unique identification number of the line, which represents an item in the quotation.

RFQ Line No.

The identification number of the line, which represents an item in the Request for Quotation document.

Item Code

The code identifying the item.

Variant

The variant of the item.

Description

The textual description of the item.

Quantity

The quantity of the item required.

UOM

The unit of measurement of the item in which it is supplied.

Cost

The cost pertaining to the items for which the quotation is prepared.

Per

The Basic unit of the UOM specified in which the item is measured.

Basic Price

The basic price of the item.

Basic Price = [ (Cost/Per) * Quantity]

Taxes

The taxes of the item.

Additional Charges

The additional charges of the items.

Total Value

The total value of the line item.

Total Value = Basic Price + Taxes + Additional Charges

Schedule Type

Use the drop down list to select “Single” or “Staggered”. If Single is selected, the items are delivered all at a time. If “Staggered” is selected, the items are delivered in parts.The system displays blank by default.

Price Break

Use the drop down list to select “Yes” or “No” to mention whether price break is applicable.If "Yes" it means that the price at which the material is being offered varies with the quantity purchased.  The system displays blank by default.

The system displays the following in the multiline :

Need Date

The date in which the items are required.

Receipt At

The place in which the items are received and receipted.

The system ensures the following before saving :

4Quotation quantity should be less than the RFQ quantity.

4The status of the RFQ will be “Quoted” if the quotation lines have a reference of RFQ line number.

The system displays the following in the “Data History” group box :

Created By

The login ID of the person who created the Quotation.

Created Date

The date on which the Quotation was created.

Last Modified By

The  login ID of the person who modified the Quotation.

Last Modified Date

The date on which the Quotation was modified last.